Built to Withstand Extreme Heat
Nuref Service's installs, repairs, and maintains high-temperature refractory linings for steel mills, cement plants, glass furnaces, and petrochemical facilities. Zero unplanned downtime. Guaranteed.

Steel Industry
Blast Furnace & BOF Linings
Cement Plants
Rotary Kiln & Preheater Systems
Glass Furnaces
Crown, Wall & Floor Refractories
Everyinstallationisengineeredtoenduretemperaturesabove3,000°F—becauseyouroperationcan'taffordtostop.

Years in Operation
Projects Completed
Industry Sectors
Refractory Services Built for Industrial Scale
New Refractory Installation
Full lining installation for new industrial furnaces, kilns, and vessels — from engineered design to final cure.
Hot & Cold Repairs
Emergency and scheduled repair of damaged or worn refractory linings with minimal production disruption.
Gunning & Shotcreting
High-velocity application of refractory materials for hard-to-reach areas and rapid turnaround repairs.
Anchor Systems & Steel Work
Custom stud welding, anchor installation, and steel fabrication to support refractory in complex geometries.
Inspection & Condition Assessment
Thermal imaging, thickness gauging, and detailed condition reports to plan maintenance before failures occur.
Turnkey Project Management
End-to-end management of major relines — coordinating materials, crews, and outage scheduling for zero surprises.
Request a Project Quote
Tell us about your facility and refractory needs. Our project engineers will respond within one business day with a preliminary scope and timeline.
- HeadquartersRamsgate
- Phone0713795182
- Emailrapidrefrac@gmail.com
- Office HoursMon – Fri: 7:00 AM – 5:00 PM · Sat: 8:00 AM – 1:00 PM
Work That Speaks for Itself

US Steel — Gary Works Blast Furnace Reline
Gary, Indiana
4,200 tons of refractory installed. Full BF hearth, stack, and bosh reline completed in 18-day outage.

Lehigh Cement — Kiln Brick Replacement
Mason City, Iowa · 2024

PPG Industries — Float Glass Furnace Repair
Circleville, Ohio · 2023
ExxonMobil — Reformer Furnace Lining
Baytown, Texas · 2023

Novelis — Aluminum Smelter Rebuild
Oswego, New York · 2022
"Nuref Service's executed our 14-day blast furnace reline with zero safety incidents and came in two days ahead of schedule. That kind of precision is what keeps our furnace running for the next five years."
- AWS D1.1 Certified Welding
- OSHA 30-Hour Certified Crews
- ISO 9001:2015 Quality Management
- NFPA 85 Compliant Procedures
- EPA Clean Air Act Compliance
Nuref Service's Completes Largest Single-Contract Reline in Company History
A 22-day outage at a major integrated steel mill in Indiana resulted in 4,800 tons of high-alumina brick installed — our largest single contract to date.
Read More →